Monday, June 16, 2014

Addendum #2

I received Addendum #2 from Gateway Engineers on Thursday, June 12, 2014 at 4:10 PM. It includes:

 4.2. Per grading plan there is fill installation required to raise the southwest corner to elevation.

A comment, from the previous thread:

Elaine,
It looks like the 4.2 specification you posted refers to the infill that is installed after the turf is laid down, not before. You indicated it is to raise the southwest corner to elevation.
The 4.2 infill in the document does not raise the level. It merely provides a cushion in the turf surface after installation.
I am very interested in seeing all documentation per the grading plan to raise the southwest corner to elevation. If you can post it, things would be greatly cleared up.

June 16, 2014 at 4:50 AM

Here are the photos from the Grading Plan Subgrade Elevations:




















The next group of photos is from the Grading Plan Final Grade Elevations






2 comments:

Anonymous said...

The question in my mind is that do these plans follow the regulations of the Municipal Planning a Code? If they do, how we find out? Everything has to be approved before any permits are issued.

Anonymous said...

http://www.alleghenyplaces.com/pdf/MPC_Municipal_Handout_8_1_12.pdf